MTR Shatin To Central Link Contract 1180A Communications System Modification For Hung Hom Reprovisioning

The scope of Works included the following:
• Design, manufacture, supply, delivery, system assurance, installation, testing and commissioning of the C&C systems including PABX, Infotainment and Fibre Network;
• Modify and reconfigure existing C&C equipment in the Operating Railway;
• Design service cutover plans and methodologies from existing cables to new cables without affecting Operating Railway;
• Integrate the system to the existing C&C equipment in the Operating Railway;
• Relocate existing C&C equipment and associated cables in the Operating Railway;
• Divert, reprovision and protect existing cables;
• Decommission, remove and dispose redundant equipment in the Operating Railway;